Electric Horizontal Band Saw Machine
Portable Horizontal Band Saw is our patented product. It is easy to Install and operate. Smooth finishing by Carbide Band Saw Blade. The cutting kerf is small, reduce the waste to high output. Suitable for Cutting Expensive wood in the furniture factory and move around to cut wood in virgin forest.
Product Description
Model |
MJ700P |
MJ1000D |
MJ1300D |
MJ1600D |
Max sawing wood diameter |
700mm |
1000mm |
1300mm |
1600mm |
Saw wheel diameter |
600mm |
700mm |
700mm |
700mm |
Sawing wood thickness |
2-250mm |
2-230mm |
2-230mm |
2-230mm |
Standard sawing wood length |
4500mm |
power |
22HP Petrol |
22HP Diesel |
22HP Diesel |
22HP Diesel |
up/down |
hydraulic |
machine length |
5800mm |
weight |
1100kg |
1100kg |
1300kg |
1500kg |
Model |
MJ700E |
MJ1000E |
MJ1300E |
MJ1600E |
Max sawing wood diameter |
700mm |
1000mm |
1300mm |
1600mm |
Saw wheel diameter |
600mm |
700mm |
700mm |
700mm |
Sawing wood thickness |
2-250mm |
2-300mm |
2-300mm |
2-300mm |
Standard sawing wood length |
4500mm |
4500mm |
4500mm |
4500mm |
Motor power |
15kw |
18.5kw |
22kw |
30kw |
Machine length |
5800mm |
5800mm |
5800mm |
5800mm |
Weight |
1100kg |
1100kg |
1300kg |
1500kg |
Mchine Pictures
Correction Saw Blade Tool
Saw blade modification tools include: roller press, welding machine, gear grinding machine
MR417 Roll-Machinery
welding machine
Saw blade grinding machine
Our Company






Certifications
In order to ensure the conformity of the series production, our company has taken the related procedures mentioned below:
1)The complete technical construction file(TCF) has been established before applying for the CE marking certificate.
2) Carry out the inspection for parts and components according to the TCF
Before the assemblies of the series production, the QC engineers of our company have to check and inspect the technical specifications and intended functions of parts and components to ensure the correct use of them according to the contents of TCF and principle described in the related technical information.
3) Carry out the inspection & testing for the products before packing
Before packing the products, the QC engineers of our company have to do the necessary inspection and testing to ensure the conformity of related requirements.
4) Carry out the inspection for the packing
5) Provision for the change of design
6) Provision for the Quality Assurance